So... we went out to pick up some flooring we'd paid for but it wasn't available at the time we were there, and apparently missed quite the storm. In the 2 hours we were gone, enough rain went through to leave
large puddles, and obviously there was enough wind to make a number of large branches and even trees go down! It almost looked like we missed a small hurricane or something! We're not quite sure what exactly we missed, but anyway... it was obviously quite the storm! We got another storm late last night as well, which we were here for, and it seemed to plant itself over us for quite a while!
Now for the oops from the title...
Justin learned something new last night. We had a slight plumbing emergency, when he decided to pull the large PVC elbow pipe thing off the main water-in pipe and discovered, much to our dismay, that it is a 1 inch pvc pipe. Why dismay over this discovery? Well, we found out that it wasn't a very durable piece of PVC... it broke-- just snapped with a little pressure! So, Justin went running to turn off the main water in the front, because obviously when you break the pipe just above the ground where it comes out, there is no other water turn off! So, then, realizing that we had to fix the pipe, and considering it somewhat of an emergency, we headed out for Home Depot to get the stuff we needed to fix the thing despite our not preferring to shop on Sundays. But, let's face it, had the pipe burst and we been living in the house and not brave enough to try to fix it ourselves, we'd have made an emergency plumbing call so we would have water by the next day!
Anyway, as we were figuring out what all we needed to get at Home Depot, we realized that since we already had that portion of the piping apart, we might as well replace the connector they had running through the wall that *was* steel (I think...?) with proper copper piping like the rest of the house's pipes are, so we added a piece of 1/2 inch copper pipe, a 1/2 inch elbow thing, and a little stop valve thingy for a "main" turn off
inside the house to our list of things to get just in case something happens to the interior piping, knowing how well everything else has been done (NOT!). Oh, and then we realized that in order to turn the water back on, we also needed a hot water and a cold water stop valve, because one was completely shot (we had to turn off the hot water in order to do anything with the pipes in the first place). Our list, in the end was something like... one 1 inch PVC connector, one 1 inch PVC sleeve, one 1 inch PVC elbow with threading for the 1/2 inch piping, PVC primer and glue, one 1/2 inch threaded copper pipe connector, one (short) piece of 1/2 inch copper pipe, one 1/2 inch copper piping elbow, 2 stop valves for sink stuff, 1 stop pressure valve for the "just in case" main turn off inside the house. So, after we got all the stuff we needed, and some assistance from the guy at Home Depot in figuring out how to put this all together, we also added a soldering tip, and a little kit of soldering stuff to the list of things we needed, in order to put the piping together.
We dropped by Justin's parents house to get the blow torch so that the soldering could be done (we didn't have a torch), and headed back to the house. Justin got the PVC primed, and while the primer was drying, we worked on the yard. He worked on filling the hole in the back yard with the pile of dirt, and I gave the willow a "hair cut". I don't like how the willow looks for the first few days after it's been trimmed... maybe because it just looks unnaturally even or something, but within a couple of weeks it should be back to my "magical" little tree again, so it's not that big a deal. After we got the bit of yard work done, Justin glued the PVC piping into place, and then we went inside to work on the copper piping. That's when we discovered just how much "fun" it can be to solder something together! Justin's first time soldering piping for water pipes actually went quite well. Aside from the learning curve it has, in that you have to learn just how hot to get things, and how high the flame needs to be and everything, it was quite easy, I think! So, anyway, after about 2 hours of working on the piping, and having everything in place, Justin turned on the main water. What a loud bang it made when it hit our turned
off pressure stop! Well, it would have worked great, except that one of the pieces of PVC didn't quite stick, so we ended up with having to redo that part of the PVC. Justin went and worked on that this morning, and says that now he just has a small leak in one of the pieces of PVC, and then the water is back to perfect working order... YAY!
The next order of business with the water is to figure out the natural gas stuff. For some reason there doesn't appear to be a gas cutoff. This means we cannot cap things off, because the gas will be leaking out as we work to remove pipes. So, I think Justin has to contact the gas company or something and find out how to remove the piping without having a gas leak occur. Anyway, the gas is what serves our water heater, and currently the pilot flame isn't lit. Well, that needs to happen sometime soon, because I now have 36 diapers that need a minimum of like 6-8 washes (according to the package!) before their first use! I have to say, though the diapers are "thin" I really like how they feel! I know there are a lot of people who don't really like flats, and particularly don't like birdseye cotton flats from Gerber, but having now felt them, I really can't see how they are any different from prefolds, unless you are using like... a lightweight denim or flannel for the prefold! And hey, I can put a flannel diaper/receiving blanket on the inside or outside of these if I need to... or both! Talk about versatile! Initially, I can't see our needing more than these diapers. They feel quite absorbent to me, even without having been washed even once. Though they are "see through" they really aren't that see through once they have been folded properly and are ready for pinning (yes, I tested it out already), and, they are supposed to fluff up quite a bit with every wash and dry for the first 6-8 washes (which is why they need so many washes). They actually apparently don't even necessarily achieve their maximum absorbency until they have been washed like 10-12 times or even more in some cases! Anyway, now I'm excited about washing diapers! I wonder how long that excitement will last... Well, considering I love watching my washing machine, I might just be excited about every load of laundry I have to do, regardless of what its contents are, LOL!
So... there's all the big news from this past week. In case you were wondering, no, we didn't get the other bedroom done, but that is largely because of a couple of things. 1) We couldn't find flooring to match the flooring we already had, so we had to spend an afternoon looking at flooring instead of actually working in the room. 2) Because we had our plumbing emergency, which took over the time that would have been for painting the ceiling and levelling the floor. I think Justin is working on getting a day off either tomorrow, or next Tuesday in an attempt to be able to get that room done by Saturday night (we want to be fully moved by the 23rd, but can't really do much until floors are levelled and that room is done, because we don't want to be pulling the bed out again once it is in!!). Anyway, hopefully we'll have the master bedroom done, and... maybe... the dining room?? done by the time the end of next weekend comes! YAY!